Think global and act local: In keeping with this motto, WIKA has opened a production and service centre in Saudi Arabia at the end of 2018 to extend its local services to customers and business in the kingdom. The company is based at Al-Khobar on the Gulf Coast. …
WIKA insight
Large-scale temperature solution: 37-metre thermowell
Stefan Schneider | WIKA insightAt WIKA USA we are used to dealing with unusually sized temperature solutions. However, this request from a customer was abnormal, even for US standards - during a plant shutdown at the Freeport (Texas) site, it was urgently necessary to replace two flanged thermowells …
Larger offer: WIKA India extended location in Pune
Stefan Schneider | WIKA insightIt was a great day for WIKA India: At the end of September 2018, the subsidiary put the extension building at the production site in Pune into operation. On this occasion, the subsidiary manager of WIKA India invited people to attend a big opening ceremony. This …
Record! 18-inch flow nozzle manufactured in just 20 weeks
Stefan Schneider | WIKA insightAt the end of 2018, for a flow measurement application in India, the WIKA Group manufactured a PTC-6 nozzle with a diameter of 18 inches for the first time - and in a record time of just 20 weeks. The overall length of this nozzle, including upstream/downstream piping, …
Balance of indoors and outdoors
Stefan Schneider | WIKA insightEver thought about what triathletes do in the winter? Hibernate, maybe? Or laze around doing nothing? Or even let themselves go entirely? The reality, of course, is none of those, because a widely known and apt adage from the sporting world tells that "summer winners …




